|
|
BLUEWater
Design Group provides on going engineering and construction support
services for the construction of the marina, residential docks and
shore side improvements throughout the Lake, which is a continuation
of work started by Mr. Bazley while at Moffatt & Nichol Engineers.
The improvements to date include a central 100-slip marina with
slope access structures, more than 25 residential docks and three
major public access docks. All facilities required specific design
services for the cable stayed anchoring system to accommodate the
lake level fluctuations, deep water and rock bottom conditions.
The residential dock designs include a variety of access systems
ranging from a cantilever gangway support to landscape stairways
with gangway hinge abutments.
Additionally, construction is scheduled
for completion in Mid-January 2003 for the extensive lake edge improvements
adjacent to the Ritz-Carlton Hotel and Casino and the Intrawest
mixed used retail/residential developments. BDG has provided the
planning, design and construction oversight for the unique lake
edge treatment of a rustic stacked boulder retaining wall along
the entire reach of the lake. The stacked boulder wall serves as
the foundation for the waterfront promenade, a pedestrian bridge
with waterfall and lagoon, lake overlooks, mini amphitheater and
future boat dock access. |