BLUEWater Design Group was selected by the developers
of Marina Verolme to prepare the analyses, calculations and designs
of the floating wave attenuator (FWA) and its anchoring system. The
FWA is required to provide wave protection for the creation of a marina
at a rehabilitated industrial site. The FWA was designed as a reinforced
concrete, post tensioned structure to be constructed locally. Work consisted
of preparing calculations, and designs for the floating wave attenuator
and the preparation of numeric model analyses to determine the structure
alignment and section properties.