BLUEWater Design Group prepared the design/build documents
for the Phase I construction of the overall marina redevelopment masterplan.
The construction project included installation of a new mainwalk, 28
fingers, new technology (SEAFLEX) anchoring system, fuel dock and complete
utilities. The construction was completed in June 2002, within seven
weeks, while maintaining the marina and commercial operations.
BLUEWater Design Group provided all onsite inspections
and construction engineering support. BDG is currently preparing the
construction contract documents for the Phase II marina improvements
scheduled for the second quarter of 2003. Phase II construction will
replace a second dock consisting of a mainwalk and more than 30 slips,
complete with utilities and SEAFLEX anchoring systems. This will be
the last ‘maintenance’ replacement leading to the reconstruction
of the remainder of the marina basin and installation of a floating
wave attenuator scheduled for 2004.