BLUEWater Design Group (BDG) was retained to prepare
a masterplan and conceptual engineering for this 1,200 slip marina and
recreational development. Included in the supporting landside facilities
is a 500 slip dry stack storage system. Site layout and concept plans
were prepared for the dry stack storage element as well as the overall
marina development plan.
The project is currently in the entitlement-processing
phase. Site infrastructure and new highway access construction has begun
for this green field site. Marina development is scheduled for 2004/2005.
BDG will be responsible for preparation of the design – build
contract documents for this element of the development.