BLUEWater Design Group provided marina planning and
design services to the consultant team selected to prepare a masterplan
for the expansion of the existing Tahoe City Marina. Alternatives were
developed to expand the marina and breakwater facilities while complying
with local agency development criteria ranging from providing for parking
and snow storage requirements to minimizing environmental and scenic
impacts and restoring fish spawning beds. The masterplan alternatives
include facilities for up to a 400-slip marina, marine repair and maintenance
services (including travel lift and jib cranes), boat rental and sales,
and yacht club facilities. Mr. Bazley’s responsibilities included
development of the marine engineering planning, preliminary construction
cost estimates for the basin perimeter protection and marina improvements.